Jessica Leong · Registered Estate Agent E3208 · 010-464 6088PropNex Realty Sdn Bhd E (1) 1800/1 · Office 03-2161 8608
Call

Salak Tinggi, Sepang · Industrial

Suntrack Hub 2, Salak Tinggi: 2-storey semi-D factories in Sepang

Last updated 29 Oct 2026 · Prices from the developer price list dated 27 Nov 2025

Suntrack Hub 2 is an industrial park by Suntrack Development in Bandar Baru Salak Tinggi, Sepang, Selangor.[2] Phase 1 has 28 two-storey semi-detached factories with 11,044 to 15,608 sq ft of land and 7,567 to 8,412 sq ft built-up, at SPA prices from RM4,816,000 to RM5,839,000.[1]

Marketed by Jessica Leong, Registered Estate Agent E3208, PropNex Realty Sdn Bhd (E (1) 1800/1). Not the developer.

  • 2-storey semi-D factories
  • Phase 1: 28 units
  • 99-year leasehold
  • From RM4.82 mil (SPA)
Phase 1 at a glance
SPA priceRM4,816,000 to RM5,839,000[1]
Land area11,044 to 15,608 sq ft[1]
Built-upType A 8,412 sq ft · Type B 7,567 sq ft[1]
Units28 (16 Type A, 12 Type B)[1][2]
TenureIndustrial, individual 99-year leasehold title[2]
CompletionTo confirm

SPA prices per developer price list dated 27 Nov 2025; subject to change, availability to be confirmed.

What is Suntrack Hub 2?

A guarded industrial park of 2-storey semi-detached factories on a 26.34-acre site, with 62 units planned in two phases: Phase 1, the current launch, has 28 units on 10.97 acres, and Phase 2 has 34.[1][2] It follows the developer's Suntrack Hub 1 in Bangi. The developer lists a 9 m clear ceiling height, 30 kN/m² floor loading, wide mullion-free motorised shutters for truck access and a 66 ft road reserve with a wide-turn junction for trucks and trailers.[2]

Suntrack Hub 2: key details
DeveloperSuntrack Development Sdn Bhd, developer of Suntrack Hub 1 in Bangi[2]
LocationKawasan Perindustrian Bandar Baru Salak Tinggi, 43900 Sepang, Selangor, fronting Jalan Labohan Dagang–Nilai[2]
Site26.34 acres. The developer describes it as an elevated site on hard ground with very low flood risk[2]
Factory types (Phase 1)Type A (A1, A2): 12,174 sq ft standard land, 8,412 sq ft built-up. Type B (B1, B2): 11,044 sq ft standard land, 7,567 sq ft built-up. Corner and some intermediate lots have extra land[1]
Phase 234 units: 18 Type C, 4 Type D and 12 Type E semi-D factories[2]
Extra landCharged at RM175 psf[1]
Ceiling and floor loading9 m clear ceiling height; 30 kN/m²; wide mullion-free motorised shutters for truck access[2]
Access and expansion66 ft road reserve with a wide-turn junction for trucks and trailers. Expansion-ready, subject to local authority approval[2]
Green featuresRainwater harvesting tanks, EV charging isolator points, solar panel conduit ready, insulated steel decking roof, natural ventilation and lighting[2]
Power supplyTo confirm
Security24/7 security patrolling and CCTV, paid through a monthly service charge, run first by the developer and later by a Factory Owners' Association; buyers sign a Deed of Mutual Covenant[2]. Charge amount: To confirm
CompletionTo confirm. Building construction was reported as targeted to start in April 2026[3]
Booking feeTo confirm

To confirm = not stated in the sources below. Jessica will confirm these with the developer before you commit.

Phase 1 price list: all 28 units

SPA prices · 27 Nov 2025
Phase 1: 28 units, SPA prices per developer price list dated 27 Nov 2025
No.Lot addressTypePositionLand (sq ft)Built-up (sq ft)SPA price
11 Jalan 3AA1Corner15,0598,412RM5,743,000
22 Jalan 3AA1Corner15,6088,412RM5,839,000
33 Jalan 3AA1Intermediate12,2288,412RM5,248,000
42A Jalan 3AA1Intermediate12,1748,412RM5,238,000
55 Jalan 3AA1Intermediate12,2608,412RM5,253,000
66 Jalan 3AA1Intermediate12,1748,412RM5,238,000
77 Jalan 3AA1Intermediate12,2828,412RM5,258,000
88 Jalan 3AA1Intermediate12,1748,412RM5,238,000
99 Jalan 3AA1Intermediate12,3148,412RM5,263,000
1011 Jalan 3AA1Intermediate12,3468,412RM5,268,000
1113 Jalan 3AA1Intermediate12,3688,412RM5,272,000
1215 Jalan 3AA1Intermediate12,4008,412RM5,278,000
1317 Jalan 3AA2Intermediate12,4328,412RM5,283,000
1419 Jalan 3AA2Intermediate12,4548,412RM5,288,000
1521 Jalan 3AA2Intermediate12,4868,412RM5,293,000
1623 Jalan 3AA2Corner15,1778,412RM5,765,000
1713 Jalan 3BB2Intermediate11,7547,567RM4,940,000
1812A Jalan 3BB2Intermediate11,1417,567RM4,833,000
1915 Jalan 3BB2Intermediate11,0447,567RM4,816,000
2016 Jalan 3BB2Intermediate11,0447,567RM4,816,000
2117 Jalan 3BB2Intermediate11,0447,567RM4,816,000
2218 Jalan 3BB2Intermediate11,0447,567RM4,816,000
2319 Jalan 3BB2Corner13,3367,567RM5,218,000
2420 Jalan 3BB2Corner13,3367,567RM5,218,000
2513 Jalan 3CB1Intermediate11,0767,567RM4,822,000
2615 Jalan 3CB1Intermediate11,0447,567RM4,816,000
2717 Jalan 3CB1Intermediate11,0447,567RM4,816,000
2819 Jalan 3CB1Corner13,3367,567RM5,218,000

SPA prices per developer price list dated 27 Nov 2025; subject to change, availability to be confirmed. Land area includes any extra land. Ask Jessica which units are still available.[1]

Where is Suntrack Hub 2?

In the Bandar Baru Salak Tinggi industrial area in Sepang, on the road between Banting and Nilai.[2] EdgeProp puts the site about 10 km from the Bandar Serenia toll on the ELITE highway.[3]

Sales office: No. 54, Ground Floor, Jalan 2, Medan 120, Bandar Baru Salak Tinggi, 43900 Sepang.[2]

Suntrack Hub 2
Bandar Baru Salak Tinggi
Sepang, Selangor

Open in Google Maps

Want the latest price list or a site visit?

Tell Jessica the size and use you need, and she will check which units are still available and arrange a site visit.

Suntrack Hub 2: frequently asked questions

Where is Suntrack Hub 2?

In Kawasan Perindustrian Bandar Baru Salak Tinggi, 43900 Sepang, Selangor, fronting Jalan Labohan Dagang–Nilai, according to the developer's website.[2]

How much is a factory in Phase 1?

SPA prices in the developer's price list dated 27 Nov 2025 range from RM4,816,000 to RM5,839,000 for the 28 Phase 1 units. Prices are subject to change and availability must be confirmed; WhatsApp Jessica for the current price list.[1]

Is it freehold or leasehold?

The developer's website states an industrial, individual 99-year leasehold title. Check the title and its conditions with your lawyer before you commit.[2]

When will it be completed?

Completion date is to be confirmed. EdgeProp reported in January 2026 that building construction was targeted to start in April 2026.[3]

Does it have a KPKT advertising permit?

No permit is needed. The Housing Development Act controls the development of housing accommodation; industrial property is not covered, so there is no developer licence or advertising permit from KPKT and no statutory SPA. Have your own lawyer review the SPA.[4]

Your agent for industrial property

Jessica Leong, Registered Estate Agent E3208, PropNex Realty Sdn Bhd (E (1) 1800/1), A-G-03, Marc Residence, No. 3, Jalan Pinang, 50400 Kuala Lumpur. Office 03-2161 8608. Check both registrations on the LPEPH register.

Jessica is not the developer. Information on this page is taken from the sources cited and may change; the developer's documents and the SPA prevail.

Sources

4 references
  1. [1] Suntrack Development, Suntrack Hub 2 Phase 1 price list dated 27 Nov 2025 (supplied to Jessica Leong).
  2. [2] Suntrack Hub 2 website, Suntrack Development (accessed 29 Oct 2026; also the source of the images on this page). https://suntrack.com.my/hub2/
  3. [3] EdgeProp.my, "Suntrack launches RM318 mil industrial hub in Salak Tinggi", 28 Jan 2026. https://www.edgeprop.my/content/1915140/suntrack-launches-rm318-mil-industrial-hub-salak-tinggi
  4. [4] The Edge Malaysia, "Protect your rights when buying commercial properties" (on the Housing Development Act and non-residential property). https://theedgemalaysia.com/article/protect-your-rights-when-buying-commercial-properties

Facts are from the developer's price list and website and a press report, and may change; the SPA prevails.

More industrial property

Nilai, Negeri Sembilan

Hamilton Industrial Park

Freehold ready-built factories by Sime Darby Property, further along the road to Nilai.

Get the price list or arrange a site visit

Send Jessica your details and she will reply by WhatsApp or phone with current prices, specifications or a site visit. Prefer to chat now? WhatsApp 010-464 6088 or call.

* Required. Name and phone number are needed so Jessica can reply.
WhatsApp Jessica